Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 39 results ...

Abdelgawad, M A M (2011) Hybrid decision support system for risk criticality assessment and risk analysis, Unpublished PhD Thesis, , University of Alberta (Canada).

  • Type: Thesis
  • Keywords: expert system; liability; reliability; risk assessment; risk analysis; risk identification; risk management; failure; case studies; fuzzy logic; risk analysis; Monte Carlo
  • ISBN/ISSN:
  • URL: https://www.proquest.com/docview/848629819
  • Abstract:
    Risk management is essential for the construction industry to successfully fulfill project objectives. Several studies were conducted in the past decade to support quantitative risk analysis. These studies were based on using some of the commonly used techniques such as risk matrix, decision trees, Monte Carlo, and sensitivity analysis. However, some of these techniques are limited because they either do not support quantitative risk analysis, or are difficult to be utilized due to the required amount of data to support quantitative risk analysis. To address such limitations, a comprehensive framework was developed, based on combining three well-known techniques in reliability engineering, i.e., failure mode and effect analysis, fault trees, and event trees with fuzzy logic. Fuzzy logic and failure mode and effect analysis were first combined to provide an answer to the problem of identifying of critical risk events through the development of a fuzzy expert system software package named Risk Criticality Analyzer. To support quantitative risk analysis in the construction industry, fault tree and event tree were combined, and fuzzy logic is used to solve both of them. Fuzzy arithmetic operations on fuzzy numbers were used to represent logical gates in the fault tree structure, and to conduct event tree analysis. To automate solving both fault trees and event trees, Fuzzy Reliability Analyzer was designed and implemented using Visual Basic.net. Both tools were then validated through case studies. The results indicate that by using the proposed methodology, the risk can be assessed effectively and efficiently. The proposed framework presented in this research provides the contribution of combining fuzzy logic with failure mode and effect analysis, fault trees, and event trees in a comprehensive framework to support risk identification, risk assessment, and risk response. Since the proposed framework is based on using linguistic terms, risk analysts are offered a more convenient and practical framework to conduct risk analysis. The proposed framework was able to address several limitations attributed to the conventional application of failure mode and effect analysis and offered a generic framework that can be adapted to fit any industry or organization.

Al-Bataineh, M T (2008) Scenario-based planning for tunnelling construction, Unpublished PhD Thesis, , University of Alberta (Canada).

Allouche, E N (2001) A decision-support model for selection of a trenchless construction method, Unpublished PhD Thesis, , University of Alberta (Canada).

Alvanchi, A (2011) Incorporating the effects of complex dynamic interactions in the construction decision making process, Unpublished PhD Thesis, , University of Alberta (Canada).

Azimi, R (2011) An integrated real-time control system for structural steel fabrication projects, Unpublished PhD Thesis, , University of Alberta (Canada).

Chehayeb, N N (1996) Simulation-based project control, Unpublished PhD Thesis, , University of Alberta (Canada).

Corona Suarez, G A (2007) Simulation-aided framework for assessing the effect of project quality management on construction performance, Unpublished PhD Thesis, , University of Alberta (Canada).

Dissanayake, G M (2006) An integrated computational intelligence framework for construction performance diagnosis, Unpublished PhD Thesis, , University of Alberta (Canada).

El Ghandour, W (2007) Integrated information-based construction simulation system, Unpublished PhD Thesis, , University of Alberta (Canada).

Elbarkouky, M M G (2010) A fuzzy consensus building framework for early alignment of construction project teams on the extent of their roles and responsibilities, Unpublished PhD Thesis, , University of Alberta (Canada).

ElNimr, A A (2011) Enhancing space modeling and mobile resources planning in construction operations through a simulation driven visualization framework, Unpublished PhD Thesis, , University of Alberta (Canada).

Fan, H (2007) Leveraging operational data for intelligent decision support in construction equipment management, Unpublished PhD Thesis, , University of Alberta (Canada).

Hajjar, D (1999) A unified modeling methodology for simulation-based planning of construction projects, Unpublished PhD Thesis, , University of Alberta (Canada).

Hasan, M S (2013) Decision support system for crane selection and location optimization on construction sites, Unpublished PhD Thesis, , University of Alberta (Canada).

Inyang, N I (2013) A framework for ergonomic assessment of residential construction tasks, Unpublished PhD Thesis, , University of Alberta (Canada).

Langevine, R (2006) A decision support system for the maintenance management of buildings, Unpublished PhD Thesis, , University of Alberta (Canada).

Lu, M (2000) Productivity studies using advanced ANN models, Unpublished PhD Thesis, , University of Alberta (Canada).

Mah, D E (2011) Framework for rating the sustainability of the residential construction practice, Unpublished PhD Thesis, , University of Alberta (Canada).

Manavazhi, M R (1998) A configuration-based modeling methodology for the automated generation of simulation models in construction, Unpublished PhD Thesis, , University of Alberta (Canada).

Mao, X (2008) The framework of TRIZ-enhanced-value engineering analysis and its knowledge management, Unpublished PhD Thesis, , University of Alberta (Canada).

Moghadam, M (2014) Lean-mod: An approach to modular construction manufacturing production efficiency improvement, Unpublished PhD Thesis, , University of Alberta (Canada).

Moghani, E (2013) A simulation-based framework for as-built documentation of construction process and product information, Unpublished PhD Thesis, , University of Alberta (Canada).

Mogollon, J D M (2009) Automation of design and drafting for wood frame structures and construction waste minimization, Unpublished PhD Thesis, , University of Alberta (Canada).

Nassar, N K (2005) An integrated framework for evaluation, forecasting and optimization of performance of construction projects, Unpublished PhD Thesis, , University of Alberta (Canada).

Olearczyk, J (2010) Crane lifting operation planning and lifted object spatial trajectory analysis, Unpublished PhD Thesis, , University of Alberta (Canada).

Saba, F (2012) A semantic-driven framework for facilitating reusability and interoperability of construction simulation modeling, Unpublished PhD Thesis, , University of Alberta (Canada).

Salem, O M (1999) Infrastructure construction and rehabilitation: Risk-based life cycle cost analysis, Unpublished PhD Thesis, , University of Alberta (Canada).

Shaheen, A A-H I (2005) A framework for integrating fuzzy set theory and discrete event simulation in construction engineering, Unpublished PhD Thesis, , University of Alberta (Canada).

Shahin, A A (2007) A framework for cold weather construction simulation, Unpublished PhD Thesis, , University of Alberta (Canada).

Sharma, V (2010) Asset levels of service-based decision support system for municipal infrastructure investment, Unpublished PhD Thesis, , University of Alberta (Canada).

Song, L (2004) Productivity modeling for steel fabrication projects, Unpublished PhD Thesis, , University of Alberta (Canada).

Taghaddos, H (2010) Developing a generic resource allocation framework for construction simulation, Unpublished PhD Thesis, , University of Alberta (Canada).

Van Tol, A A (2005) Agent embedded simulation modeling framework for construction engineering and management applications, Unpublished PhD Thesis, , University of Alberta (Canada).

Wang, P (2006) Production-based large scale construction simulation modeling, Unpublished PhD Thesis, , University of Alberta (Canada).

Xie, H (2011) Improving dynamic project control in tunnel construction, Unpublished PhD Thesis, , University of Alberta (Canada).

Xu, J (2001) CAD-based integrated simulation environment (CAD-ise), Unpublished PhD Thesis, , University of Alberta (Canada).

Younes, B (2013) A framework for invoice management in construction, Unpublished PhD Thesis, , University of Alberta (Canada).

Yu, H (2010) An integrated approach toward lean for production homebuilders, Unpublished PhD Thesis, , University of Alberta (Canada).

Zhang, X (2006) Toward innovative and efficient infrastructure delivery, Unpublished PhD Thesis, , University of Alberta (Canada).